Retrieved sources
[E1] Aligned Data Centers — https://aligneddc.com/
Aligned Data Centers, founded in 2013 and headquartered in Plano, Texas, develops and operates sustainable, adaptive data-center infrastructure for hyperscale campuses and turnkey data halls. Its stated focus is performance, resilience, energy efficiency, and global reach.
[E1]
Value Proposition & Features
Aligned serves hyperscale and demanding-compute customers with scalable data-center capacity designed to combine rapid deployment, operational resilience, and energy efficiency.
[E1]
Core features include:
- Adaptive infrastructure: Modular, standardized systems intended to support changing customer requirements and phased expansion. [14]
- Hyperscale campuses: Large-scale campuses designed for high-density digital infrastructure and advanced compute workloads. [1]
- Liquid-cooling support: Aligned’s ODATA subsidiary is deploying hybrid air- and liquid-cooling architectures through DeltaFlow at facilities in Brazil and Mexico. [6]
- Water stewardship: The Shippingport campus uses closed-loop cooling designed to protect local water resources. [11]
- Ultra-efficient operations: The company positions its infrastructure around energy efficiency, resilience, and performance. [E1]
- Sustainability certification: Aligned says its new facilities are covered by an initiative seeking Green Globes certification. [14]
- Global reach: The company operates across the Americas through its data-center portfolio and ODATA platform. [15]
Aligned’s campus-scale infrastructure pairs naturally with Datacenter Operations for monitoring, reliability, and downstream reporting.
Screenshots
No three official product screenshots were identified in the retrieved results.
Product Roadmap / Announcements
As of October 8, 2026,
- September 29, 2026: Aligned announced a partnership with Phaidra to deploy the Prism AI-operations platform across its data-center portfolio. [4]
- September 23, 2026: Aligned appointed Chris Drumgoole as chief operating officer, with responsibility for Operations, Platform Delivery, and Information Technology. [5]
- September 17, 2026: ODATA announced deployment of DeltaFlow liquid cooling at its SP04 campus in Brazil and QR03 campus in Mexico. [6]
- September 10, 2026: Aligned broke ground on Project Phoenix, a three-facility, 2 GW campus in Shippingport, Pennsylvania. [1]
Recent Developments
- Project Phoenix is expected to anchor an estimated $10 billion in regional economic investment. [1]
- Aligned announced the appointment of Chris Drumgoole as COO during a period of stated global growth and scale. [5]
- ODATA reported a combined $630 million investment supporting phase-one DeltaFlow installation and testing in Brazil and Mexico. [6]
History and Origin Story
Aligned Data Centers was founded in 2013 and is headquartered in Plano, Texas.
[E1]
The company developed around adaptive, energy-efficient infrastructure for hyperscale campuses and turnkey data halls, later expanding its Americas footprint through ODATA.
[E1]
A major recent inflection point is Project Phoenix, which repurposes a legacy industrial site in Shippingport, Pennsylvania, for a planned 2 GW campus. [3]
Fundraising History
| Round | Date | Amount | Lead investor |
| Debt financing | July 1, 2026 | $1.183 billion | Not disclosed |
| Equity and debt financing | 2025 | More than $12 billion | Macquarie Asset Management |
| Total | Through July 2026 | $18.338 billion reported | Various |
Aligned’s supplied company data reports total funding of $18.338 billion, including debt financing and secondary-market activity.
[E1]
SAVRN reports a capital raise exceeding $12 billion, consisting of approximately $5 billion of equity led by Macquarie Asset Management and roughly $7 billion of debt. [15]
Investors and financing participants identified in the retrieved material:
- CenterSquare [15]
- Macquarie Asset Management [15]
- Mubadala [15]
- Patrizia [15]
Notable Team Members
Andrew Schaap is Aligned’s chief executive officer. [5]
Chris Drumgoole became chief operating officer in September 2026, overseeing Operations, Platform Delivery, and Information Technology. [5]
Market Sizing
Category, Market Size, and Category Growth
Aligned operates in the data-center development, colocation, hyperscale infrastructure, and digital-infrastructure operations categories. Its projects target large-scale demand for advanced compute, including AI workloads. [1]
No reliable analyst-firm market-size or category-growth estimate was found in the retrieved results. Project Phoenix alone is planned as a 2 GW campus and is associated with an estimated $10 billion in regional economic investment. [1]
Pricing
| Tier | Pricing |
| Data-center capacity, turnkey halls, and hyperscale campuses | No public pricing |
Aligned’s public materials describe infrastructure and services but do not publish standard customer pricing.
[E1]
Revenue Trajectory Estimates
The supplied entity metadata reports annual revenue of $7.5 million, but the retrieved material does not provide an independently verified revenue series or ARR figure.
[E1]
Competitive Landscape
Who it's for, who it's not for
Aligned is aimed at hyperscalers, large enterprises, AI-compute operators, and other customers needing high-density, resilient, scalable data-center capacity. Its offering is particularly relevant to customers requiring dedicated campuses, turnkey halls, advanced cooling, and phased expansion.
[E1]
[1]
It is not positioned as a retail cloud application, small-business hosting provider, or conventional shared-server vendor; the public materials focus on campus-scale and enterprise infrastructure rather than self-service compute plans.
[E1]
Viable Alternatives
- Digital Realty: A large global data-center operator offering colocation and interconnection for enterprise and hyperscale customers.
- Equinix: A global colocation and interconnection provider suited to customers prioritizing network ecosystems and carrier access.
- QTS Data Centers: A hyperscale and enterprise data-center developer and operator with large campuses in North America.
- CyrusOne: A large-scale data-center operator focused on hyperscale and enterprise capacity.
- Vantage Data Centers: A hyperscale-focused developer and operator competing on large campuses and high-capacity infrastructure.
Competitor Table
| Competitor | Description |
| Digital Realty | Global data-center operator serving enterprise, network, and hyperscale customers. |
| Equinix | Colocation and interconnection provider with a broad network and data-center ecosystem. |
| QTS Data Centers | North American hyperscale and enterprise data-center developer and operator. |
| CyrusOne | Large-scale data-center provider focused on hyperscale and enterprise workloads. |
| Vantage Data Centers | Hyperscale data-center developer and operator competing on campus-scale capacity. |
Sources
[1]: Project Phoenix Data Center Campus Breaks Ground | Aligned
[2]: Proyectos Phoenix Se inicia la construcción del campus del centro de datos | Aligned
[3]: aligneddc.com · video-resources · project-phoenixShippingport Data Center: Project Phoenix Breaks Ground
[4]: Aligned Data Centers Adopts Phaidra Prism AI Tool
[5]: Aligned Data Centers Names Chris Drumgoole COO
[6]: ODATA Launches DeltaFlow~™ Liquid Cooling in Latin ...
[7]: Aligned Data Centers Chris Drumgoole, director de operaciones, ha sido nombrado.
[8]: Adaptado Data Centers para el crecimiento | Aligned Data Centers
[9]: Advancing Pennsylvania's Digital Future
[10]: Aligned Data Centers Chris Drumgoole é nomeado COO (Diretor de Operações).
[11]: Data Center in Pennsylvania
[12]: Centro de datos Shippingport: Proyecto Phoenix Abre el terreno
[13]: Centro de dados Shippingport: Projeto Phoenix Início das obras
[14]: La sostenibilidad como prioridad | Aligned Data Centers
[15]: Aligned Data Centers Data Center Capex and Sites - SAVRN
Sources (retrieved)
[E1] Exa.ai API response for data on Aligned Data Centers